>> PRODUCT CLASS

>> CONTACT US

Coal / concrete machinery Sales Hotline:
TEL:+86-516-80268027/80268028
PHONE:+86-13685118552
E-MAIL:
xzdajin@dakingroup.com
ADDRESS:
Huaxia Road,High-Tech Development Zone, Tongshan District, Xuzhou City, Jiangsu Province

Current position:Home>Products>Solar photovoltaic system>Off-grid PV system

Off-grid PV system

Off-grid PV system: Communication base station system

  

  Main project: 1.Microwave relay system power supply 2.Mobile or China Unicom road relay transmitter and receiver system power supply. 3.Other sites can not connect power supply electrical equipment.
  Disadvantage

 

traditional power generation

Solar photovoltaic system

Disadvantage of fire power: it needs coal,petroleum and other fossil fuel. The fossil fuel will drain, and it generates carbon dioxide, sulfur oxides and dust, it lead to greenhouse effect and acid rain, seriously affect our health

Disadvantage of water power: Water will flood large areas of land, resulting in the destruction of the ecological environment. Water is limited and affected by the seasons.

Disadvantage of Nuclear power: nuclear power is clean in normal circumstances, but if the nuclear leak, the consequences will be serious.

 

1.Solar energy resources are not depleted danger, resources are widely distributed, low operation cost, less territory restriction. It can be installed everywhere, supply nearly to avoid the loss of long cable transmission.

2.No noise, good stability.

3.Energy saving, no pollution, is ideal clean energy.

4.The cycle of solar power system design and installation is short, quick effect, long service life, easy maintenance, low maintenance cost, especially suitable for use in unmanned condition.

5.It is easy to use, avoid wasting resources.

 

 

Industry policy:

The government support the development of new energy policies: support Grid-Connected PV, Off-grid PV and large grid connected photovoltaic power generation projects, as well as silicon purification, grid connected photovoltaic power generation industry. According to the principle of photovoltaic power generation system and its supporting transmission and distribution projects for a total investment of 50% of the grant; the independent photovoltaic power generation system in remote areas without electricity at a total investment of 70% of the grant for the project; construction and infrastructure industry key technology of photovoltaic power generation, mainly through subsidies and subsidies to support.

  • The name cannot be empty。*
  • Phone is not null!*
  • Please fill in the form, cannot be empty! *